Painting & Epoxy

How Much Does Painting Cost in Dubai? Factors That Affect the Price

Professional Dubai painting service showing interior and exterior painting for a modern property, with paint tools and a Dubai skyline.
Quick answer

Wondering how much painting costs in Dubai? Explore typical painting prices, per-square-foot rates, apartment and villa costs, and the key factors that affect your final quote.

If you are planning to repaint your apartment, villa, or office in Dubai, the first question that comes to mind is: how much does painting cost in Dubai? The honest answer is that there is no single fixed price. Painting costs in Dubai vary depending on the size of your property, the condition of your walls, the type of paint you choose, and the level of preparation required. Most residential painting projects in Dubai range between AED 3 to AED 12 per square foot, but the final cost depends on several important factors we will explain clearly in this guide.

Many property owners make the mistake of comparing quotes based on a single number. A cheaper quotation does not always mean better value. A proper professional painting project involves surface preparation, crack repair, primer application, multiple coats of paint, and a clean finish. Skipping any of these steps can lead to peeling paint, uneven colour, and a job that needs to be redone within months. This guide will help you understand exactly what goes into a professional painting job and how to compare quotations fairly.

Best Maintenance Services has completed 500+ residential and commercial painting projects across Dubai, including apartments in Business Bay, Jumeirah, Al Barsha, and villas across Dubai Hills Estate, Palm Jumeirah, and Mirdif. Whether you need painting services in Dubai for a single room or a full villa repaint, our experienced team delivers clean, lasting results. For commercial spaces, we also provide office painting services with minimal disruption to your business.

Painting Cost in Dubai at a Glance

Here is a quick overview of typical painting prices in Dubai to help you get started. These are indicative ranges and actual costs will depend on the condition of your property, paint quality, and preparation required.

Property / Service TypeEstimated Cost Range (AED)Notes
Studio ApartmentAED 800 – 1,500Basic repaint, good wall condition
1-Bedroom ApartmentAED 1,200 – 2,500Standard prep + 2 coats
2-Bedroom ApartmentAED 2,000 – 4,000Includes ceilings and prep
3-Bedroom ApartmentAED 3,000 – 6,000Full surface prep included
Villa (Interior)AED 5,000 – 18,000+Depends on size and ceilings
Villa (Exterior)AED 4,000 – 15,000+Includes scaffolding access
Office / Commercial SpaceAED 4 – 12 per sq ftVaries by scope and hours
Painting per Square FootAED 3 – 12 per sq ftLabour + materials combined

How Do Painters Calculate the Cost of a Painting Job?

Professional painters in Dubai use a few different pricing models depending on the type and size of the project. Understanding these methods helps you ask the right questions when comparing quotations.

Pricing by Square Foot

This is the most common pricing method used for residential projects. However, there is an important difference between floor area and paintable surface area. The paintable surface area includes all four walls plus the ceiling in each room, which is often 2.5 to 3 times larger than the floor area. When comparing painting quotes in Dubai, always confirm whether the contractor is quoting by paintable square footage or floor area, as this makes a significant difference.

Pricing by Square Metre

For larger projects such as commercial offices, warehouses, and villa exteriors, contractors often calculate costs in square metres. This is especially common in Al Quoz, Dubai Silicon Oasis, and commercial zones. One square metre equals approximately 10.76 square feet, so rates per square metre are typically between AED 30 and AED 130 depending on the scope.

Fixed Price for the Whole Property

Many painting companies in Dubai offer package pricing for apartments, villas, and individual rooms. This model works well for move-out repainting, standard condition apartments, and tenants who need a full repaint before handing back keys. A fixed package price gives you budget clarity upfront.

Labour and Materials Pricing

Some contractors quote labour-only pricing and ask the client to supply paint. Others provide a complete package that covers labour, paint, primer, putty, and preparation materials. Always confirm what is included. A labour-only quote may appear cheaper but can end up costing more once you purchase the correct paint and materials separately.

10 Factors That Affect Painting Cost in Dubai

These are the real reasons why two properties of a similar size can receive very different painting quotations. Understanding each factor will help you make smarter decisions and avoid budget surprises.

1. Size and Paintable Surface Area

The larger the property, the more paint and labour are required. But property size alone is not the full picture. A high-ceilinged villa in Palm Jumeirah with double-height living spaces and grand staircases will cost significantly more to paint than a compact apartment with the same floor area. Ceilings, staircases, and feature walls all add to the total paintable surface and therefore the final painting cost in Dubai.

2. Condition of the Walls and Ceilings

Walls with cracks, peeling paint, water stains, mould marks, or damaged plaster require more preparation before painting begins. Attempting to paint over damaged surfaces produces a poor finish that quickly breaks down. A professional painting team will inspect all wall surfaces and include the cost of necessary repairs in the quotation. The worse the condition, the higher the preparation cost.

3. Surface Preparation and Priming

Surface preparation is one of the biggest factors affecting painting cost per square foot in Dubai. It includes cleaning, scraping old paint, filling cracks and holes, applying putty, sanding, and priming. Skipping preparation is the single most common cause of paint failure. A thorough preparation job takes time and skilled labour, which is reflected in the quotation. The cheapest quote often involves little or no preparation which is why it looks cheaper.

4. Type and Quality of Paint

The quality of paint chosen has a direct impact on the total painting cost in Dubai. Economy paint is cheaper but fades faster and requires repainting sooner. Premium washable paints, moisture-resistant coatings, and specialty interior finishes cost more per litre but last longer and look better over time. For bathrooms and kitchens, moisture-resistant paint is essential. For exterior walls, a weather-resistant and UV-stable coating is recommended given Dubai's harsh sun and humidity.

5. Number of Coats Required

Most professional painting jobs require a primer coat plus two finish coats as a minimum. If you are making a significant colour change particularly from a dark colour to a lighter shade additional coats may be needed to achieve an even result. Every additional coat adds to both material costs and labour time. Always ask your painting contractor how many coats are included in the quotation.

6. Interior vs Exterior Painting

Exterior painting in Dubai typically costs more than interior work. Exterior surfaces face intense UV exposure, high temperatures, sandstorms, and humidity, which means they require weather-resistant coatings, more thorough preparation, and in many cases, scaffolding or access equipment for elevated surfaces. Dubai Municipality maintains technical guidelines covering approved paints and surface treatments for building exteriors, which professional contractors follow when specifying the right coating for each surface.

7. Property Type and Layout

A studio apartment is straightforward to paint. A 3-bedroom villa with a complex layout, multiple bathrooms, a laundry room, and storage areas takes significantly more time. Retail spaces, warehouses, and commercial buildings have their own cost considerations, including specialized coatings and project scheduling around business hours. Always ensure the contractor understands your property type before accepting a quote.

8. Accessibility and Working Height

Painting high ceilings, steep staircases, and exterior elevations requires extra time, specialized equipment, and experienced painters who are comfortable working at height. For villa exterior projects, scaffolding or access platforms may be required, and this cost should be clearly itemized in the quotation. Properties in JLT, Downtown Dubai, and Business Bay with high-rise or complex facade elements may also carry access surcharges.

9. Furniture, Fixtures and Site Protection

A professional painting team will protect your furniture, flooring, switches, and fixtures before work begins. This includes moving furniture, covering surfaces with protective sheeting, and masking door frames, windows, and electrical outlets. Some contractors include this in the overall price; others charge separately. Always confirm what site protection is included so you are not caught with unexpected charges or damaged property after the job is done.

10. Colour, Finish and Decorative Requirements

Choosing multiple colours, accent walls, textured finishes, or decorative painting techniques adds complexity and cost to any painting project. A standard two-colour interior repaint is priced differently from a project involving five different wall colours, feature textures, and detailed gloss finishes on woodwork and doors. Knowing your finish requirements in advance helps your contractor give you an accurate painting quotation from the start.

How Much Does It Cost to Paint an Apartment in Dubai?

Apartment painting is the most common residential service in Dubai. Prices vary depending on the number of bedrooms, wall condition, and paint quality chosen. These ranges are based on standard-condition apartments using quality interior paint with a full preparation and two-coat finish. If you need villa painting service instead, scroll down to the villa section below.

Studio Apartment

Estimated cost: AED 800 – 1,500 A studio apartment has limited wall area but still requires full surface preparation. The smaller space and fewer corners and angles make studio painting faster and more affordable. Painting a studio is ideal as a quick property refresh before a new tenancy.

1-Bedroom Apartment

Estimated cost: AED 1,200 – 2,500 A 1-bedroom apartment in Dubai typically involves the living area, bedroom, kitchen walls, bathroom, and one or two bathrooms. Standard painting includes surface prep, primer, and two finish coats. Costs increase if the walls have cracks, stains, or significant damage.

2-Bedroom Apartment

Estimated cost: AED 2,000 – 4,000 A 2-bedroom apartment in areas such as Jumeirah, Al Barsha, or Deira will have a larger paintable surface area including ceilings. Costs rise when high-quality premium paint is selected or when rooms have significant preparation requirements.

3-Bedroom Apartment

Estimated cost: AED 3,000 – 6,000 A 3-bedroom apartment is a full-scale residential painting project. Surface preparation for all rooms, hallways, bathrooms, and kitchen walls significantly affects the final apartment painting price in Dubai. Budget more if the property has not been repainted in several years.

How Much Does Villa Painting Cost in Dubai?

 

Villa painting in Dubai involves significantly larger surface areas, more complex layouts, higher ceilings, and often more demanding access requirements. It is one of the largest residential painting investments and deserves careful planning and an itemized quotation.

Interior Villa Painting

Estimated cost: AED 5,000 – 18,000+ Interior villa painting costs are driven by the number of rooms, ceiling heights, staircase access, and the number of coats required. A 4-bedroom villa in Dubai Hills Estate or Mirdif with high ceilings and multiple bathrooms will sit at the upper end of this range. Premium paint, decorative finishes, and accent walls push costs higher. Always ask for a full breakdown by room.

 

Exterior Villa Painting

Estimated cost: AED 4,000 – 15,000+ Exterior villa painting requires weather-resistant coatings, crack repair on external surfaces, scaffolding or access platforms, and additional preparation given Dubai's harsh climate. External walls suffer from UV damage, thermal expansion, and occasional moisture ingress. Choosing the wrong exterior paint leads to early peeling and costly repainting. Professional exterior painting extends the life of your villa's facade significantly.

Full Interior and Exterior Painting

Combining interior and exterior painting in a single project is often more cost-effective than doing them separately, as mobilization, site protection, and scaffolding can be shared across both scopes. Discuss this with your contractor and ask for a combined quotation to compare the saving against separate quotes.

How Much Does Commercial and Office Painting Cost in Dubai?

 

Commercial painting projects in Dubai have unique requirements that residential projects do not. Whether you run a restaurant in Bur Dubai, a retail unit in JLT, or a warehouse in Al Quoz, the painting cost is affected by working hours, access restrictions, and the type of coating required. Our office painting services are designed to minimize business disruption while delivering a professional, durable finish.

 

What Makes Commercial Painting Different?

Commercial painting is not simply residential painting at a larger scale. Key differences include:

•  Larger surface areas: more paint, more time, more labour

•  Working hours restrictions: some buildings require painting outside business hours or overnight

•  Specialist coatings: anti-graffiti coatings, industrial-grade paint, fire-retardant finishes

•  Business continuity: phased painting to avoid disrupting operations

•  Access restrictions: shared buildings require advance coordination with building management

•  Compliance: commercial coatings must meet Dubai Municipality building standards

Typical commercial painting rates in Dubai range from AED 4 to AED 12 per square foot depending on the above factors. Always request an itemized quotation that breaks down labour, materials, access requirements, and working hours.

Interior vs Exterior Painting: Which Costs More?

 

Here is a direct comparison to help you understand the key cost differences between interior and exterior painting projects in Dubai.

 

FactorInterior PaintingExterior Painting
Surface PreparationModerateModerate to High
Paint TypeInterior coatingWeather-resistant coating
Access RequirementsUsually easyCan be difficult
Working HeightUsually lowerOften higher
Weather ExposureNoneHigh (UV, heat, humidity)
Safety EquipmentMinimalScaffolding / platforms
Typical Cost ImpactLowerHigher

What Is Usually Included in a Professional Painting Quote?

 

A complete professional painting quotation from a reputable Dubai painting contractor should clearly list what is and is not included. Here is what a proper quote should cover:

Site Inspection

A professional painter will visit the property before quoting. This inspection allows them to assess wall condition, measure the paintable area accurately, identify any damage that needs repair, and recommend the correct type of paint for each surface.

Surface Preparation

This is the most important part of any painting project. It includes cleaning dirty walls, removing loose or flaking paint, applying putty or filler, sanding, and priming. Good preparation determines whether paint lasts 2 years or 7 years.

Crack and Minor Wall Repairs

Small cracks, holes from picture hooks, and surface imperfections should be filled and sanded before painting. This is often included in standard painting packages but confirm it is included in your quotation.

Primer Application

A primer coat seals the wall surface, improves paint adhesion, and helps achieve an even colour. It is particularly important when painting over dark colours, stained surfaces, or fresh plaster. Always confirm primer is included in the scope.

Paint Application

The number of finish coats should be clearly stated usually a minimum of two. The painting method (roller, brush, or spray) and the brand and grade of paint should also be specified.

Furniture and Floor Protection

Professional painters protect your floors, furniture, switches, and window frames with dust sheets and masking tape before work begins. Confirm this is included rather than assuming.

Final Touch-Ups

A quality painting job includes a final inspection and touch-up of any missed spots, drips, or uneven areas before the team leaves.

Site Cleanup

The contractor should remove all waste, paint tins, dust sheets, and masking tape and leave the property clean on completion. Confirm this is part of the package.

Quick Checklist: What to Confirm Before Signing a Painting Contract

✔  Is the quote based on paintable surface area or floor area?

✔  How many coats of paint are included?

✔  Is primer included in the price?

✔  What paint brand and grade will be used?

✔  Is surface preparation and crack filling included?

✔  Is furniture and floor protection included?

✔  Is site cleanup included?

✔  Are there any potential hidden or additional charges?

What Can Increase Your Painting Budget?

Even with a detailed quotation, some situations can push the final cost above the initial estimate. Knowing these in advance helps you plan more accurately.

Extensive Wall Repairs

If walls have major cracks, large holes, or significant plaster damage, repair costs can add substantially to the overall budget. A visual inspection often reveals less damage than what becomes apparent once old paint is removed.

Severe Peeling or Damaged Paint

When existing paint is severely peeling or bubbling, it must be fully stripped before new paint can be applied. This stripping process takes extra time and labour.

Moisture or Water Stains

Water stains from leaks or condensation must be treated with a stain-blocking primer before painting. If the underlying moisture problem has not been resolved, stains will bleed through new paint regardless of how many coats are applied.

High Ceilings and Difficult Access

Double-height ceilings, staircase walls, and hard-to-reach exterior elevations require additional time, equipment, and care. This adds to both labour charges and project duration.

Premium Paint Selection

Choosing a high-end premium paint brand instead of a standard option can add AED 10 to AED 30 per litre to material costs. For a large villa, this adds up significantly.

Decorative or Textured Finishes

Specialty finishes such as textured paint, Venetian plaster effect, or metallic coatings require more skill, time, and materials than standard wall painting.

Major Colour Changes

Changing from a dark colour to a very light shade for example dark grey walls to white requires additional coats to achieve full coverage. Expect at least one extra coat and possibly more.

Urgent or After-Hours Work

If you need a property painted urgently before a new tenant moves in, or if commercial space requires overnight or weekend painting to avoid business disruption, expect a surcharge on standard rates.

How to Compare Painting Quotes in Dubai

 

Comparing painting quotations in Dubai can be misleading if you only look at the final total price. Two quotes for the same apartment can differ by AED 1,000 or more for legitimate reasons and sometimes for less legitimate ones. Here is how to compare properly. You can also explore painting services in Dubai to see what a professional scope of work should look like.

Check the Total Paintable Area

Make sure every contractor is quoting based on the same surface area. Ask each one to clearly state the total square footage or square metres they are pricing.

Confirm the Paint Brand and Product

A quote using economy paint cannot be compared fairly to one using premium washable paint. Ask for the specific brand, product name, and finish type.

Ask How Many Coats Are Included

Always confirm whether the price includes primer plus two finish coats or just one coat. This single detail can account for a large price difference.

Review Surface Preparation

Ask each contractor specifically what surface preparation is included: cleaning, crack filling, putty, and priming. This is where many cheap quotes save money at your expense.

Confirm Labour and Materials

Is the quote labour-only or does it include paint and materials? Make sure you are comparing like for like.

Look for Hidden Charges

Ask specifically whether additional charges can apply after work begins. Common hidden extras include disposal fees, scaffolding hire, and additional repair costs discovered after walls are stripped.

Compare the Scope, Not Just the Final Price

The cheapest quote is not always the cheapest job. A low-cost painting quotation that skips preparation, uses cheap paint, and applies one coat will likely need to be redone within 12 to 18 months. A properly prepared, properly painted property can look excellent for 5 to 7 years.

How to Reduce Painting Costs Without Sacrificing Quality

There are sensible ways to manage your painting budget without cutting corners on quality. These practical tips come from experience across hundreds of residential and commercial painting projects in Dubai.

Get the Walls Inspected Before Quoting

Identifying and resolving any moisture or structural issues before painting begins prevents you from painting over a problem that will return and cause paint failure.

Paint Multiple Areas in One Project

Scheduling your apartment interior, villa exterior, and common areas in a single project reduces mobilization costs and often gives you room to negotiate a better rate overall.

Choose the Right Paint for Each Surface

Using the correct paint grade for each surface avoids over-specifying in low-wear areas and under-specifying in high-traffic areas. A good painting contractor will recommend the right product without overselling.

Plan the Work in Advance

Painting during quieter business periods or between tenancies avoids urgency surcharges and gives your contractor adequate scheduling time for a thorough job.

Compare Itemized Quotes

Requesting itemized quotations from at least two or three professional painting companies allows you to identify where price differences genuinely come from, rather than choosing blindly by total price.

When Should You Repaint a Property in Dubai?

 

In Dubai, the combination of harsh UV exposure, temperature extremes, and occasional humidity makes exterior surfaces particularly vulnerable. Interior walls also show wear from daily use, air conditioning, and cleaning. Here are clear signs that it is time to repaint:

 

•  Peeling or flaking paint: a clear sign that the existing coating has failed

•  Faded or chalky exterior: caused by UV damage and weathering

•  Cracks appearing in walls: may indicate movement or moisture, not just cosmetic wear

•  Persistent stains or discolouration: that cannot be cleaned off

•  Scuff marks and damage: particularly in high-traffic hallways and children's rooms

•  Mould or damp patches: must be treated before repainting

•  Property looks dated or tired: fresh paint increases property value and rental appeal

Important: Repainting should never be used to hide an unresolved moisture or leak problem. If your walls show water staining, identify and fix the source of moisture before any painting work begins. Painting over active moisture will result in rapid paint failure regardless of paint quality.

How Long Does Painting Take in Dubai?

Project duration is an important practical consideration, especially for tenants who need to remain in the property or businesses that cannot close for extended periods.

 

Property / ScopeTypical Duration
Single Room1 day (including prep and drying)
Studio Apartment1 – 2 days
1–2 Bedroom Apartment2 – 3 days
3 Bedroom Apartment3 – 5 days
Villa Interior5 – 10 days
Villa Exterior4 – 8 days
Commercial / Office Space3 – 10 days depending on scope

These timescales assume good access and standard-condition walls. Extensive repairs, multiple colours, decorative finishes, and adverse weather for exterior work can all extend the duration.

Is Professional Painting Worth the Cost?

Professional painting in Dubai is worth the investment when it is done correctly. A properly prepared, professionally applied paint job using quality materials will look better, last longer, and protect your walls more effectively than a rushed, cheap repaint. Here is why professional painting delivers better value:

 

•  Correct surface preparation: ensures paint adheres properly and lasts 5–7 years

•  Right paint selection: matched to the surface, climate, and usage

•  Cleaner, more even finish: particularly visible on large wall surfaces and ceilings

•  Time savings: a professional team completes the project far faster than DIY

•  Reduced risk of rework: poor painting is expensive to fix and inconvenient to redo

•  Property value: fresh professional paintwork increases rental appeal and sale value

For villas and commercial spaces, attempting DIY painting or hiring the cheapest possible painter often results in costly remedial work within a year. Best Maintenance Services brings over 5 years of Dubai painting experience and a proven track record with 500+ satisfied customers across residential and commercial properties.

Common Mistakes People Make When Hiring Painters in Dubai

These are the most costly mistakes property owners make when arranging painting services in Dubai. Avoiding them can save you significant time and money.

Choosing Only by the Lowest Price

A low price usually means shortcuts somewhere less preparation, cheaper paint, or fewer coats. The result is paint that peels, fades, or looks uneven within months.

Not Asking About Surface Preparation

Many homeowners assume preparation is always included. It often is not in the cheapest quotes. Always ask specifically what preparation work is included before agreeing to any price.

Assuming Primer Is Included

Primer is a separate product and application step. Confirm it is included. Painting without a proper primer, especially on fresh plaster or over stains, leads to uneven colour and poor durability.

Comparing Floor Area Instead of Paintable Area

The paintable area of an apartment or villa is always larger than the floor area. If one contractor quotes based on floor area and another on paintable area, you cannot compare them fairly without clarifying this.

Ignoring Wall Damage Before Painting

Painting over cracks, damp patches, or damaged plaster does not fix the problem it hides it temporarily and leads to worse problems later. Resolve all wall issues before painting begins.

Accepting a Verbal Quote Without a Clear Scope

Always get your painting quotation in writing. A written scope of work protects both parties and ensures the contractor delivers exactly what was agreed.

Why Choose Best Maintenance Services for Painting in Dubai?

 

Best Maintenance Services Dubai's Trusted Painting Partner

✔  5+ years of professional painting experience in Dubai and the UAE

✔  500+ satisfied residential and commercial customers

✔  200+ completed villa maintenance and painting projects across Dubai

✔  Experienced and trained painting technicians

✔  Transparent AED pricing with itemized quotations no hidden charges

✔  Premium and standard paint options to suit every budget

✔  Full surface preparation, crack repair, priming, and cleanup included

✔  Fast response across Dubai including Downtown, JLT, Al Barsha, Deira, and Dubai Hills

✔  Preventive maintenance plans to keep your property looking its best year-round

✔  Reliable customer support and professional workmanship standards

 

Best Maintenance Services is also listed on Fixpert Solutions, a trusted home services marketplace in the UAE, making it easy for property owners across Dubai to find, review, and book professional painting and maintenance services with confidence.

Frequently Asked Questions About Painting Cost in Dubai

How much does painting cost in Dubai?

Painting in Dubai typically costs between AED 3 and AED 12 per square foot for labour and materials combined. An apartment repaint ranges from AED 800 to AED 6,000 depending on size and condition. A villa can cost AED 5,000 to AED 18,000 or more for a full interior repaint.

How much does it cost to paint a 1-bedroom apartment in Dubai?

A 1-bedroom apartment in Dubai typically costs between AED 1,200 and AED 2,500 for a complete repaint including surface preparation, primer, and two coats of quality interior paint.

What is the painting cost per square foot in Dubai?

Professional painting rates in Dubai range from AED 3 to AED 12 per square foot of paintable surface area. The rate depends on paint quality, preparation required, and the type of property. Always confirm whether the contractor is quoting on paintable area or floor area.

Does painting cost include labour and materials?

Not always. Some contractors quote labour-only pricing and require you to supply the paint. Others provide a complete package covering labour, paint, primer, putty, and materials. Always clarify what is included before accepting any quotation.

How long does it take to paint an apartment in Dubai?

A studio takes 1–2 days, a 1–2 bedroom apartment takes 2–3 days, and a 3-bedroom apartment takes 3–5 days. Timescales depend on wall condition, number of colours, and required preparation.

How often should I repaint my property in Dubai?

Interior walls in Dubai typically need repainting every 3 to 5 years, depending on usage and wear. Exterior surfaces may need repainting every 2 to 4 years due to UV exposure and harsh weather conditions. Using quality, weather-resistant paint for exteriors extends this interval.

Is it cheaper to supply my own paint?

It can be, but only if you know exactly which paint grade and quantity is required. Professional painting contractors often get better trade prices on quality paint than retail consumers. Ask your contractor for a quote both ways and compare the total cost of each option before deciding.

Get an Accurate Painting Quote for Your Dubai Property

Best Maintenance Services provides transparent, itemized painting quotes for apartments, villas, offices, and commercial properties across Dubai. No hidden charges. No vague estimates.

Prices stated in this guide are indicative ranges based on market conditions in Dubai as of 2025–2026. Actual costs depend on property condition, paint quality, scope of work, and contractor. Always request a site visit and itemized written quotation before proceeding.

BMS service support

Need a quote or technical guidance?

Share your emirate, property or business type, relevant photos, site access details and preferred timing. BMS will confirm the appropriate next step.

Review us Trustpilot